SOP Price Analysis
Comparison of Existing vs. Proposed JBME Procurement Costs
Total Parts Tracked
1
Existing Total Cost
₹ 1,04,412.00
Proposed Total Cost
₹ 98,166.60
Total Savings (INR)
₹ 6,245.40
| Sr. No. | Part Details | Model | Qty (Req) | Existing Details | Proposed Details (JBME) | Variance | ||
|---|---|---|---|---|---|---|---|---|
| Supplier | Price/Pc | Supplier | Price/Pc | |||||
| 1 |
Pivot
#47471873
|
Combine | 70 PCS | Global Engineering | ₹ 1,491.60 | JBME Internal | ₹ 1,402.38 |
- ₹ 89.22
5.98% Savings
|
Note: Pricing for Part #47471873 (Pivot) reflects a direct manufacturing cost reduction through JBME optimization. Current inventory levels at Global Engineering should be depleted before switching.